IYC Calls on Tinubu to Preserve Original Lagos-Calabar Coastal Highway Route
The Ijaw Youth Council Worldwide has formally appealed to President Bola Tinubu to intervene in the growing controversy surrounding the proposed diversion of the Lagos-Calabar Coastal Highway. The council is urging the President to direct the Minister of Works, David Umahi, to retain the original route that was approved by the Federal Executive Council, warning that any alteration to the alignment would have serious consequences for the South-South region.
The appeal was made during a press conference held on Thursday at the Ijaw House in Yenagoa, Bayelsa State. The IYC described the reported plan to alter the route of the 750-kilometre highway as unacceptable not only to the Ijaw nation but also to other ethnic nationalities across the South-South geopolitical zone.
Concerns Over Route Diversion
At the heart of the dispute is a proposal to divert the coastal highway to merge with the existing East-West Road from Ondo State. The IYC warned that such a diversion would undermine the interests of Edo, Delta, Bayelsa, and Rivers states, all of which were included in the original coastal alignment approved by the Federal Executive Council.
The council, led by its National President, Dr Doubra Okotete, called on President Tinubu to ensure that the project follows the original coastal corridor passing through Ondo, Edo, Delta, Bayelsa, and Rivers states. The IYC also demanded that the federal government release the approved designs and engineering drawings of the entire highway to the public in order to address growing concerns about the project’s direction.
In a direct appeal to the President, the council said: “We call on His Excellency, President Bola Ahmed Tinubu, to address this matter with the needed urgency it deserves. Prove to us that the President is not just the Asiwaju of Lagos State or the Jagaban of the West, but the President of Nigeria.”
Demand for Immediate Construction Across All Sections
The IYC urged the President to call the Minister of Works to order and ensure that the highway is constructed in accordance with the original design approved before the contractor was mobilised to site. The council further demanded the immediate commencement of work on the Rivers, Bayelsa, Delta, and Edo axis, alongside construction on the Lagos-Ondo and Cross River-Akwa Ibom sections.
According to the IYC, the reported justification of financial constraints and difficult terrain for altering the route was unacceptable, particularly given the substantial contributions of the South-South to the nation’s economy. The council posed a pointed question: “How can a project be too expensive or its terrain too difficult in the very region that produces over 85 per cent of the nation’s wealth?”
The council argued that oil and gas revenues from the region had contributed significantly to national development and the construction of major infrastructure projects in other parts of the country. It insisted that the South-South should not be excluded from a project intended to benefit its coastal communities.
Evidence That Difficult Terrain Can Be Overcome
To counter the argument that the terrain in the Niger Delta is too challenging for the coastal highway, the IYC cited ongoing road and bridge projects by the Bayelsa State Government and the Niger Delta Development Commission. These projects, according to the council, demonstrate that swampy and riverine terrain can be overcome with adequate political will and commitment.
The council specifically referenced the Nembe-Brass Road project, the Yenagoa-Oporoma-Ukubie Road, and the Ekeremor-Agge Road in Bayelsa State, as well as the Port Harcourt-Okrika Road and Bonny Ring Road projects. These examples, the IYC noted, prove that infrastructure development in the region is achievable despite environmental challenges.
In a notable offer, the IYC expressed willingness to sponsor a fully funded visit by former Cross River State Governor Donald Duke to Bayelsa to inspect some of these infrastructure projects and assess the challenges of road construction in the Niger Delta. The council maintained that the difficulty of the terrain should not be used as a reason to abandon the original coastal alignment after the project had already undergone feasibility studies, design, and commencement of construction.
Political Implications Ahead of 2027
The IYC also addressed the political implications of the controversy, warning that any diversion of the highway could damage President Tinubu’s acceptance and the All Progressives Congress’ electoral prospects in the South-South ahead of the 2027 general elections. The council noted that some South-South governors, including Bayelsa Governor Douye Diri, Delta Governor Sheriff Oborevwori, and Rivers Governor Siminalayi Fubara, had defected to the APC amid expectations of greater federal presence and people-oriented projects in the region.
The council cautioned: “But where the Minister of Works is allowed to follow through with his plan to divert the road from Ondo State and merge it with the already dilapidated East-West Road, then Mr President should be prepared to lose his wide acceptance and goodwill in the entire South-South. You cannot seek our votes while taking away our roads.”
Call for Transparency and Action
The IYC emphasised that the Federal Government must take concrete steps to restore public confidence in the project. It argued that assurances alone would not be sufficient without the release of the approved engineering documents and the commencement of work across the affected states. The council also expressed reservations about the Minister of Works’ subsequent clarification on the controversy, insisting that the government should demonstrate through action that the original route would be maintained.
The IYC warned that diverting the coastal highway into a rehabilitation project on the East-West Road would reinforce concerns that the project was not originally intended to serve the South-South. The council stressed that the Ijaw people were peaceful and accommodating, while urging the Minister of Works to exercise caution in his public statements and decisions on a project of national importance.
It further cautioned that any decision capable of excluding the region from the highway could have unintended political consequences as the 2027 elections approach. The IYC reiterated its demand that the 750-kilometre Lagos-Calabar Coastal Highway should retain its original alignment and that construction should proceed across all the designated sections without further delay.
Conclusion
The Ijaw Youth Council’s appeal underscores the high stakes involved in the Lagos-Calabar Coastal Highway project, which is one of the most significant infrastructure undertakings in Nigeria. As the controversy continues, all eyes are on President Tinubu and the Minister of Works to determine whether the original route will be preserved or altered. For the people of the South-South, the outcome will signal whether the federal government is committed to equitable development across all regions of the country.