Share This Post via WhatsApp

The Lagos State Government has announced a temporary three-week closure of the Oke-Afa Bridge in Isolo, scheduled to take effect from Friday, August 28, through September 18, 2026. This measure is part of a structured rehabilitation programme aimed at restoring the bridge’s structural integrity and ensuring long-term safety for commuters.

According to an official traffic management plan released by the State Commissioner for Transportation, Mr. Oluwaseun Osiyemi, the rehabilitation works will be executed in two distinct phases. The first phase, running from August 28 to September 11, will address the outbound corridor from Isolo towards Ejigbo. The second phase, scheduled from September 12 to September 18, will focus on the inbound section from Ejigbo back to Isolo.

During the initial phase, motorists travelling from Isolo towards Ejigbo will be diverted onto the Isolo-bound carriageway at Pako Roundabout. This section will temporarily accommodate two-way traffic before vehicles rejoin the main route at Mobil Filling Station. Meanwhile, traffic originating from Ejigbo will continue along the same carriageway, sharing the road with diverted vehicles from Mobil Filling Station to Pako Roundabout, after which normal flow will resume.

For the second phase, the diversion pattern will be reversed. Motorists heading from Ejigbo towards Isolo will be rerouted onto the Ejigbo-bound carriageway starting at Mobil Filling Station. Two-way movement will be maintained along this stretch until Pako Roundabout, where full access to the original carriageway will be restored. Vehicles approaching from Isolo will share the carriageway with diverted traffic from Pako Roundabout to Mobil Filling Station before regaining unrestricted passage.

To mitigate potential congestion and ensure orderly movement, the Lagos State Traffic Management Authority (LASTMA) will deploy personnel to the affected zones throughout the rehabilitation period. Additionally, an emergency tow vehicle will be stationed within the corridor to provide rapid response for any breakdowns or incidents, thereby minimising disruptions.

The state government has urged all motorists to cooperate with traffic officials and exercise patience during the temporary closure. The partial road closure is a necessary component of the broader traffic management strategy for the Oke-Afa Bridge rehabilitation project in Isolo Local Government Area. Commuters are advised to plan their journeys accordingly and adhere to the designated diversion routes to facilitate a smooth and efficient workflow.

Rate This Post / Article

Disclaimer: Every member is solely responsible for the content they publish on Nigerpress. Opinions, information, and statements expressed are not endorsed by Nigerpress.

Leave a Reply